Ottawa River
Mechanical was hired by CN Rail to complete a railway bridge replacement for three spans over the Ottawa River in Montreal, by means of PST (SPMT) equipment and a specialized overhead gantry. Three bridge spans were replaced over a two week period to minimize train schedule disruption.
Project
Gallery